70 000 m² of floors made of MaxiDalle
The design
 for the new hospital in Chambéry, with a capacity of 671 beds, combines
 modernity with architectural, town planning and environmental 
qualities, since it will be the first HQE and BBC certified hospital in 
France.
With a floor surface of more than 70 000 m² to be cast,the 
construction method was subject to a detailed study lasting almost a 
year. The consortium (GRM, Dumez Groupe, VINCI and GCC) chose MaxiDalle 
formwork designed by Alphi: an innovative concept guaranteeing high 
set-up rates and therefore optimum construction costs and observance of 
deadlines. One of the advantages of MaxiDalle—the optimum re-use of the 
plywood integrated in the frame—is proving its worth in this particular 
project, since the same sheet of plywood will have been used up to 50 
times.
Customer : Groupement VINCI et GCC
Construction time : 20 month(s)
Contact Alphi : Olivier Brosset